Language ▼
Language ▼
/
/
Changyu Group-Snow melting turnkey project

Changyu Group-Snow melting turnkey project

(Summary description)Changyu Group's gutter snow melting project for a wine estate uses Huanrui's gutter snow melting and ice melting system, and we are responsible for the turnkey project of the thermal control system for this project.

Changyu Group-Snow melting turnkey project

(Summary description)Changyu Group's gutter snow melting project for a wine estate uses Huanrui's gutter snow melting and ice melting system, and we are responsible for the turnkey project of the thermal control system for this project.

Information

Huanrui Gutter Snow Melt and Ice Melting System is used in the gutter snow melting project of a wine estate of Changyu Group, and we are responsible for the turnkey project of the thermal control system for this project.

Yantai City, where Changyu International Grape Pancheng is owned, is commonly known as one of the three "snow nests" in China. In winter, the humid and cold air from the sea is blown from the sea to the land in the north, and when it encounters mountains, it blocks the airflow from rising, thus forming convective weather in Yantai. In turn, rain and snow are formed, and winter is characterized by frequent and heavy snowfall, which poses a huge challenge to the load-bearing gutter drainage capacity of the steel structure roof with a construction area of ​​270,000 square meters. The metal roof of this project has a large area and the gutter distance is as long as 6 kilometers. In order to ensure the snow melting effect of the gutter and the roof and avoid the impact of energy consumption on the normal production of the enterprise due to the large area of ​​roof melting snow, Huanrui installed snow melting cables in the traditional gutter At the same time of paving, introduce the control mode of temperature and humidity dual control, and adopt the power balance and distribution system according to the site conditions, reasonably distribute the power consumption of each area, and combine the real-time climate conditions to apply delay control and staggered operation The way to ensure effective snow melting is to reduce energy consumption as much as possible and effectively avoid the impact on production and electricity consumption. At present, this project has been put into operation for more than 5 years, and the system is operating normally and performing satisfactorily.

Scan the QR code to read on your phone

Related information

Disclaimer:

1. The text descriptions used on this site are strictly in accordance with the provisions of the Advertising Law, and there are inevitably omissions. If any omissions are found, guidance is welcome, and we will correct them immediately.

2. Some of the pictures used on this site are collected from the Internet, and the copyright owner cannot be contacted. If you inadvertently infringe on the intellectual property rights of the copyright owner, please call and tell us, and this site will delete it immediately.

HUANRUI

Service Hotline:

400-067-0080

Address: East of Hucheng Road, Feidong Economic Development Zone, Hefei, Anhui

Electric Tracing Business Unit:

+86-551-67776888

Electric Floor Heating Business Unit:

+86-551-67776889

Marketing Service Department:

+86-13965109920 Mr. Li

访问手机网站

Copyright ©2022 Anhui Huanrui Electric Heating Equipment Co., Ltd   皖ICP备08006463号  |  Powered by www.300.cn  |  Tags  |  Business License