Installation of heating cables

Installation of heating cables

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2023-04-25
  • Views:0

(Summary description)1. The material specifications, varieties and models of various materials must conform to the design and corresponding specification requirements, and the corresponding certificates must be complete;

Installation of heating cables

(Summary description)1. The material specifications, varieties and models of various materials must conform to the design and corresponding specification requirements, and the corresponding certificates must be complete;

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2023-04-25
  • Views:0
Information

1. The material specifications, varieties and models of various materials must conform to the design and corresponding specification requirements, and the corresponding certificates must be complete;

2. To prevent the heating cable from being pressed into the insulation material, affecting the life of the heating cable, the use of steel wire mesh or metal fixing belt can prevent the heating cable from being pressed into the insulation material.

3. The inner piercing limit of the tube is carried out after confirming that the heating cable or electric heating film is laid correctly, and the cassette must be cleaned before threading, so that the color separation of the wire is correct and the balance is appropriate;

4. The installation of the thermostat should be horizontal and vertical, the standard should be accurate, close to the wall, fixed firmly, and meet the acceptance specifications of electrical sub-projects;

5. All construction personnel must wear soft-soled shoes, and clean the entire working surface after the catheter is sealed;

6. The installation project of floor radiant heating system should not be crossed with other construction operations at the same time;

7. During the pouring and maintenance of the concrete filling layer, it is not allowed to enter the trampling, and when pouring concrete, protective measures should be taken, and it is not possible to directly pedal, run over the heating cable or electric heating film heating area; After the curing period of the filling layer, it is not allowed to run heavy loads on the ground or place high-temperature objects;

8. The electric floor heating ground completed by construction is strictly forbidden to hit and impact vigorously. Do not cut holes in the ground, cut or fit into hot river objects;

9. Equipotential connection of the whole room, guarantor.

10. The thermostat probe and paving and connecting the heating cable are protected.

Scan the QR code to read on your phone

Related information

Disclaimer:

1. The text descriptions used on this site are strictly in accordance with the provisions of the Advertising Law, and there are inevitably omissions. If any omissions are found, guidance is welcome, and we will correct them immediately.

2. Some of the pictures used on this site are collected from the Internet, and the copyright owner cannot be contacted. If you inadvertently infringe on the intellectual property rights of the copyright owner, please call and tell us, and this site will delete it immediately.

HUANRUI

Service Hotline:

400-067-0080

Address: East of Hucheng Road, Feidong Economic Development Zone, Hefei, Anhui

Electric Tracing Business Unit:

+86-551-67776888

Electric Floor Heating Business Unit:

+86-551-67776889

Marketing Service Department:

+86-13965109920 Mr. Li

访问手机网站

Copyright ©2022 Anhui Huanrui Electric Heating Equipment Co., Ltd   皖ICP备08006463号  |  Powered by www.300.cn  |  Tags  |  Business License